미국
미국

myGeobrugg

Sylmar Highway 14 and 5 Interchange

비탈면 보강 시스템 - Sylmar Highway 14 and 5 Interchange 2021

The stabilized embankment at the Highway 14 and 5 interchange north of Los Angeles

비탈면 보강 시스템 - Sylmar Highway 14 and 5 Interchange 2021

Stabilized slope at the interchange from the distance (darker triangle)

비탈면 보강 시스템 - Sylmar Highway 14 and 5 Interchange 2021

Stabilized part of the slope

비탈면 보강 시스템 - Sylmar Highway 14 and 5 Interchange 2021

Slope with mesh and spike plates, view from the highway

비탈면 보강 시스템 - Sylmar Highway 14 and 5 Interchange 2021

After the wildfires, stabilizing the slope at the highway intersection had become necessary

 
 

설치 년도

2021

Situation

Slope needed to be graded and stablized after wildfire hit the Sylmar CA region. 

Description

We provided TECCO G65/3 for an anchored TECCO SYSTEM installation.

Country/Region

미국

Customer

Baltazar Construction

Engineering

Caltrans

Contractor

Baltazar Construction

Protected object

Road, Infrastructure

부식방지

GEOBRUGG SUPERCOATING

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

자연 재해
수리학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국 Regional Manager Northeast

이메일

Saleh Feidi
 

Saleh Feidi

자연 재해
수리학
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국

이메일

John Kalejta
 

John Kalejta

자연 재해
수리학
Geobrugg North America, LLC,KS 67226 Wichita / 미국

이메일

Bob Lyne
 

Bob Lyne

자연 재해
수리학
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 미국

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

이메일

Tim Shevlin
 

Tim Shevlin

자연 재해
Geobrugg North America, LLC,OR 97302 Salem / 미국

이메일