Switzerland
Switzerland

myGeobrugg

Sylmar Highway 14 and 5 Interchange

Slope Stability - Sylmar Highway 14 and 5 Interchange 2021

The stabilized embankment at the Highway 14 and 5 interchange north of Los Angeles

Slope Stability - Sylmar Highway 14 and 5 Interchange 2021

Stabilized slope at the interchange from the distance (darker triangle)

Slope Stability - Sylmar Highway 14 and 5 Interchange 2021

Stabilized part of the slope

Slope Stability - Sylmar Highway 14 and 5 Interchange 2021

Slope with mesh and spike plates, view from the highway

Slope Stability - Sylmar Highway 14 and 5 Interchange 2021

After the wildfires, stabilizing the slope at the highway intersection had become necessary

 
 

Year of installation

2021

Initial situation

Slope needed to be graded and stablized after wildfire hit the Sylmar CA region. 

Description

We provided TECCO G65/3 for an anchored TECCO SYSTEM installation.

Country/Region

United States

Customer

Baltazar Construction

Engineering

Caltrans

Contractor

Baltazar Construction

Protected object

Road, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Natural Hazards
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland , Msc. Env. Eng.

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail