瑞士
瑞士

myGeobrugg

Sylmar Highway 14 and 5 Interchange

边坡稳定 - Sylmar Highway 14 and 5 Interchange 2021

The stabilized embankment at the Highway 14 and 5 interchange north of Los Angeles

边坡稳定 - Sylmar Highway 14 and 5 Interchange 2021

Stabilized slope at the interchange from the distance (darker triangle)

边坡稳定 - Sylmar Highway 14 and 5 Interchange 2021

Stabilized part of the slope

边坡稳定 - Sylmar Highway 14 and 5 Interchange 2021

Slope with mesh and spike plates, view from the highway

边坡稳定 - Sylmar Highway 14 and 5 Interchange 2021

After the wildfires, stabilizing the slope at the highway intersection had become necessary

 
 

安装年份

2021

情况

Slope needed to be graded and stablized after wildfire hit the Sylmar CA region. 

描述

We provided TECCO G65/3 for an anchored TECCO SYSTEM installation.

国家/地区

美国

客户

Baltazar Construction

工程

Caltrans

承包商

Baltazar Construction

防护对象

Road, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 , Msc. Env. Eng.

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址