스위스
스위스

myGeobrugg

비탈면 보강 시스템 - JiJi Tour Line 2020

TECCO® G65/3 prevents unstable rocks from falling onto the railway line

비탈면 보강 시스템 - JiJi Tour Line 2020

Rocky slope above the railway line before the installation of the mesh

비탈면 보강 시스템 - JiJi Tour Line 2020

During installation of the mesh

비탈면 보강 시스템 - JiJi Tour Line 2020

Installation of the spike plates which are part of the slope stabilizing system

비탈면 보강 시스템 - JiJi Tour Line 2020

The flexible mesh following the contour of the terrain

 
 

설치 년도

2020

Situation

Due to heavy rain in 2020, the JiJi Railway encountered a slope failure (at Sta.K18+300). A rigid H-pile fence could not guarantee the required safety for the railway.

Description

The Taiwan Railways Administration (TRA) decided to stabilize the rockface with TECCO System.

Country/Region

대만

Engineering

United Geotech, INC.

Contractor

Jin Xin Engineering Co., Ltd.

Protected object

Railway

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Country Manager Southern Switzerland

이메일