Stabilizarea pantelor - JiJi Tour Line 2020

TECCO® G65/3 prevents unstable rocks from falling onto the railway line

Stabilizarea pantelor - JiJi Tour Line 2020

Rocky slope above the railway line before the installation of the mesh

Stabilizarea pantelor - JiJi Tour Line 2020

During installation of the mesh

Stabilizarea pantelor - JiJi Tour Line 2020

Installation of the spike plates which are part of the slope stabilizing system

Stabilizarea pantelor - JiJi Tour Line 2020

The flexible mesh following the contour of the terrain

 
 

Anul instalării

2020

Situația inițială

Due to heavy rain in 2020, the JiJi Railway encountered a slope failure (at Sta.K18+300). A rigid H-pile fence could not guarantee the required safety for the railway.

Descriere

The Taiwan Railways Administration (TRA) decided to stabilize the rockface with TECCO System.

Antreprenor

Jin Xin Engineering Co., Ltd.

Obiect protejat

Calea ferata

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

United Geotech, INC.

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail