Protección contra flujos de detritos y deslizamientos superficiales - Scout Road in Mytholmroyd 2016

Completed section of the SL-150 shallow landslide barrier protecting school access road and houses in Mytholmroyd

Protección contra flujos de detritos y deslizamientos superficiales - Scout Road in Mytholmroyd 2016

The road closed after the landfill land slip in 2015

Protección contra flujos de detritos y deslizamientos superficiales - Scout Road in Mytholmroyd 2016

Signs of creeping tension cracks located at the top of the slope

Protección contra flujos de detritos y deslizamientos superficiales - Scout Road in Mytholmroyd 2016

Another view of the tension cracks

Protección contra flujos de detritos y deslizamientos superficiales - Scout Road in Mytholmroyd 2016

Geobrugg engineers assisting with the SL-150 shallow landslide barrier line stake-out

Protección contra flujos de detritos y deslizamientos superficiales - Scout Road in Mytholmroyd 2016

Geobrugg engineers were on site to advise at all key milestones of the project - here to advise on the installation of the posts

Protección contra flujos de detritos y deslizamientos superficiales - Scout Road in Mytholmroyd 2016

Secondary mesh being attached to the SL-150 shallow landslide barrier

Protección contra flujos de detritos y deslizamientos superficiales - Scout Road in Mytholmroyd 2016

View of the almost completed SL-150 shallow land slip barrier

 

Sistemas

 

Longitud del sistema

232 m - 232 m

 

Año de instalación

2016

Situación inicial

During heavy storms over the Christmas holiday period 2015 a section of slope failed and slid onto Scout Road.  The road is a key access point to a local school which it was important to open as soon as possible.  Geobrugg were called to site to advise on possible solutions to protect the road so the school could be reopened.  After examining the site Geobrugg recommended SL-150 landslide barrier be placed underneath the affected area.

Following further inspection works pre-construction tension cracks were noted at the top of the slope covering approximatly 175 [m] of the slope, the section that failed was only aproximately 40 [in] width.  So it was decided the barrier should cover the entire length to mitigate against further possible landslides.

Descripción

The client's preferred contractor mobilised to site to start site clearance ahead of installing the barrier during site clearance it was noted that the failed section of slope was an old landfill area containing asbestos and not natural soils. 

With the assistance of Geobrugg engineers the fence line was set out at a length of 232 [m] with a post separation of 6 [m]. To accommodate local topography some post spacings were adjusted and an upslope direction change was marked out. 

Geobrugg engineers were on hand throughout the construction phase to assist with the installation as the contractor had never built a barrier before. The project was completed fall 2016 and the client is happy with the barrier which is the first they have had installed.

Cliente

Calderdale Council

Subcontratista

DHRA Geotechnical Ltd.

Objeto protegido

Carretera

Protección contra la corrosión

Galvanizado, GEOBRUGG SUPERCOATING

Ingeniería

JBA Consulting Ltd.

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico