Suiza
Suiza

myGeobrugg

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall barrier protecting national road DN7

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall barrier base plate anchors drilling works

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

Drilling flexible wire rope anchors for the GBE-1000A barrier

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

One of the GBE-1000A rockfall barrier lines, completely installed

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall without border post - special solution for direct rock face connection

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

Perfect solution containing passive GBE-1000A rockfall barrier and active slope stabilization with nailed TECCO® SYSTEM³

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

Another line of GBE-1000A barrier with direct rock face connection

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

Fully installed VX-060L debris flow barrier

Protección contra caídas de rocas - Olt Valley, km 239+500 - 246+500 2015

A short - only 22 m long - GBE-1000A barrier along national road DN7

 

Sistemas

 

Longitud del sistema

20 m - 50 m

 

Año de instalación

2015

Situación inicial

National road no. 7 (DN7) is one of the most important routes through the Carpathian Mountains, with heavy traffic. The Olt River runs parallel to the DN7 with high mountains, directly next to the road. In winter and spring rockfalls occur regularly. Also with unstable slopes, torrents and avalanches the risk of accidents was high. 

This project was originally developed with five concrete canopies for rockfall protection. Due to costs and other restrictions, a modern solution using high tensile steel wire was chosen. After further investigation, 23 dangerous areas were found and had to be protected using two types of protection systems: active and passive.

Descripción

GBE rockfall barriers were provided as a passive protection at the following sectors:

1. km 240+454 - 240+510

GBE-1000

  • capacity: 1000 kJ
  • height: 5 m
  • length: 56 m

2. km 240+555 - 240+577

GBE-1000

  • capacity: 1000 kJ
  • height: 3 m
  • length: 22 m

3. km 242+453 - 242+457 (as a debrisflow barrier)

VX-060

  • height: 3 m
  • length: 8 m

 4. km 242+457 - 242+610

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m and 36 m

 5. km 242+859 - 242+940

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

 

6. km 243+099 - 243+179

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

See also the other projects of Olt Valley.

Cliente

Compania Naţională de Administrare a Infrastructurii Rutiere (C.N.A.I.R.) – Directia Regionala de Drumuri si Poduri Craiova (D.R.D.P.)

Subcontratista

S.C. VECTRA GROUP S.A.

Objeto protegido

Carretera

Protección contra la corrosión

Galvanizado, GEOBRUGG SUPERCOATING

Ingeniería

A.C. IRIMAT Cons S.R.L.

Otras empresas participantes

Sachschische Bau GmbH Dresden Germany, Sibiu Branch

Otras aplicaciones instaladas

Estabilización de taludes, Protección contra flujos de detritos y deslizamientos superficiales

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico