A1 Highway Pyrzowice-Piekary Śląskie

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

Deep cut along the A1 Highway between Pyrzowice and Piekary Śląskie - nailing and flexible facing using TECCO® SYSTEM³ ensure safety and a natural look

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

For the cuts along the highway the top down method with benching was applied. The benches were subsequently nailed and covered with TECCO® SYSTEM³

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

To make the nailing as efficient as possible, some subcontractors used drill rigs installed on an excavator. This allowed drilling works flexibility

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

November 2010 - visible installation of self drilling TITAN nails

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

To allow optimal TECCO® SYSTEM³ pre-tensioning, nails were cut to the slope face and dells around were prepared

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

Flexible facing using TECCO® SYSTEM³ during installation, after the anti-erosion mats have been placed on the slope

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

TECCO® SYSTEM³ partially installed - the pre-tensioning minimises the risk of further slope deformations

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

Directly after nailing slope facing application, an extra layer of humus was applied to support further greening

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

Thanks to the applied solutions, the greening came very fast and required only seeding

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

Closer look on the fully stabilized slopes - TECCO® SYSTEM³ is nearly invisible and allows fast greening

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

The highway after the opening

Estabilização de taludes - A1 Highway Pyrzowice-Piekary Śląskie 2011

Stabilized cut - thanks to the applied solutions, the slopes maintain their natural look

 
 

Ano de instalação

2011

Situação inicial

The Polish A1 highway connecting Poland from south to north leads through Silesia. Because of the morphology of the terrain, deep cuts were required. Due to geological conditions and also due to the fact that this area is strongly influenced by the hard coal mining activity, slope stabilization was a must.

Geologia

Marls, silts, sandstones and limestones.

Descrição

For the following reasons designers together with the Polish National Roads selected TECCO® System as a stabilizing solution:

  •  complicated ground conditions – about 12 geotechnical layers were described, only 4 of these were rocks and all others soil in different compositions
  • there was an apprehension that after digging and taking off such mass of material, there will be a release of the energy and consequently, the slopes will be prone to collapse - which is quite common especially for such high slopes
  • the system can be designed and dimensioned against superficial instabilities which offer the possibility to arrange the nails in a more economical way due to the capability of TECCO® System  mesh in absorbing and transferring high loads
  • when slopes stabilized with TECCO® System are combined with anti-erosion mats, they can regain a natural or vegetated appearance, which is aesthetically preferred.


TECCO® System was designed to protect local instabilities of soil and rock masses. This worked perfectly, as first visible small movements occurred which were stopped by the TECCO® System mesh shortly after installation.

Promotor

General Directorate of National Roads and Motorways

Contratante

BUDIMEX S.A.

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

Complex Project Sp. z o.o. / Transprojekt Kraków Sp. z o.o.

Outras empresas envolvidas

Stump-Hydrobudowa Sp. z o.o. / Italcementaciones S.L.U. / PPI Chrobok S.A. / ZRI Chrobok sp.j.

O seu contacto local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Estados Unidos Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Estados Unidos Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Estados Unidos Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Estados Unidos Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Riscos naturais
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Riscos naturais
Geobrugg North America, LLC,Salem OR 97302 / Estados Unidos Sales Director

E-mail