Suiza
Suiza

myGeobrugg

Estabilización de taludes - National Highway 222, Malchej Ghat 2014

After completion of the installation

Estabilización de taludes - National Highway 222, Malchej Ghat 2014

.

Estabilización de taludes - National Highway 222, Malchej Ghat 2014

Temple protection works

Estabilización de taludes - National Highway 222, Malchej Ghat 2014

Work in progress

Estabilización de taludes - National Highway 222, Malchej Ghat 2014

.

Estabilización de taludes - National Highway 222, Malchej Ghat 2014

.

Estabilización de taludes - National Highway 222, Malchej Ghat 2014

The rockfall incident in July 2013, before the installation of the protection system

Estabilización de taludes - National Highway 222, Malchej Ghat 2014

.

 

Año de instalación

2014

Situación inicial

Malchej Ghat is a mountain pass nestled in the lofty rugged hills of the Western Ghat range in the Thane district of Maharashtra, India. It is home to hundreds of different kinds of flora and fauna, including a variety of birds such as quail, rails, crakes, flamingos and cuckoos. The area is notorious for landslide during monsoons. Malchej Ghat is situated in the Pune district, 160 Km from Mumbai and 130 km from Pune.

National Highway 222 connecting the states of Maharashtra and Telangana passes Malchej Ghat. The project location at km 92.200 is also a tourist site with a famous waterfall and a pilgrimage site with an old temple. Because of frequent rock falls during the monsoon season, the state highway is often closed for several days which severely affects the day to day life of the nearby cities. During a rockfall event in 2013, boulders weighing around 5 tons rolled down the slope and damaged vehicles and injured people in the temple area.

Descripción

The Public Works Department at Thane has the responsibility of maintaining the road and approached Geobrugg India to install rockfall mitigation. Geobrugg installed a QUAROX® net over a layer of DELTAX® mesh along the nearly vertical slope that rises nearly 120 m from the road level. The net is held in place with the support of 50 fully grouted 2 m long anchors (28 mm diameter). The complete work was carried out with the help of rope access technicians.

Cliente

Public Works Department, National Highways

Subcontratista

Pioneer Foundation Engineers, Mumbai

Objeto protegido

Carretera, Edificio

Protección contra la corrosión

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico