myGeobrugg
2011
-
The TECCO slope stabilisation system was selected to stabilise a new cutting, as part of the M80 ring road upgrade. The cutting, comprising of highly weathered basalt, was 84 degrees and up to 10m in height. Due to the highly weathered nature of the rock, an erosion control mat was placed underneath the mesh. Approximately 2500m2 of mesh was fixed to 5m long soil nails on a 2 x 2m, staggered pattern.
Tulla Sydney Alliance
Carretera
GEOBRUGG ULTRACOATING
Douglas Partners