Svizzera
Svizzera

myGeobrugg

Hydroelectric plant - Hidro-Ituango

Consolidamento di versanti - Hydroelectric plant - Hidro-Ituango 2017

Front view of the slope

Consolidamento di versanti - Hydroelectric plant - Hidro-Ituango 2017

Stabilized slope

Consolidamento di versanti - Hydroelectric plant - Hidro-Ituango 2017

Building process

Consolidamento di versanti - Hydroelectric plant - Hidro-Ituango 2017

Lateral view of the slope

Consolidamento di versanti - Hydroelectric plant - Hidro-Ituango 2017

Slope covered with TECCO® STAINLESS G65/3

 

Anno di installazione

2017

Situazione iniziale

Due to the filling levels of the dam, it was necessary to guarantee the uninterrupted operability of the tunnels during the life of the project and to prevent the damage caused by large block slides in the portals.

The designer company (Integral S.A.) required a completely stainless stabilization because it will be submerged and affected by the oxidizing agents of this water.

Descrizione

Geobrugg has the only stainless steel stabilization system on the market, TECCO® STAINLESS. This system of stainless steel increases the life cycle and reduces susceptibility to corrosion.

Because of the experience, they have in this type of project the system was installed by WARCO S.A.S. - especially as access, drilling, and injection were demanding. With highest quality standards more than 1'500 m² were stabilized.

Cliente

Consorcio CCC Ituango

Contraente:

WARCO S.A.S

Oggetto protetto

Infrastrutture

Protezione dalla corrosione

INOX / STAINLESS

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail