Suíça
Suíça

myGeobrugg

Estabilização de taludes - M80 Ring Road Upgrade 2011

.

Estabilização de taludes - M80 Ring Road Upgrade 2011

.

Estabilização de taludes - M80 Ring Road Upgrade 2011

.

Estabilização de taludes - M80 Ring Road Upgrade 2011

.

 
 

Ano de instalação

2011

Situação inicial

-

Descrição

The TECCO slope stabilisation system was selected to stabilise a new cutting, as part of the M80 ring road upgrade. The cutting, comprising of highly weathered basalt, was 84 degrees and up to 10m in height. Due to the highly weathered nature of the rock, an erosion control mat was placed underneath the mesh. Approximately 2500m2 of mesh was fixed to 5m long soil nails on a 2 x 2m, staggered pattern.

Promotor

Tulla Sydney Alliance

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG ULTRACOATING

Empreteiro

Douglas Partners

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail