Elveţia
Elveţia

myGeobrugg

Military Base Protection - Facatativá

Protecţia împotriva căderilor de pietre - Military Base Protection - Facatativá 2016

Frontal view of the barrier

Protecţia împotriva căderilor de pietre - Military Base Protection - Facatativá 2016

During installation

Protecţia împotriva căderilor de pietre - Military Base Protection - Facatativá 2016

Side view of the barrier

Protecţia împotriva căderilor de pietre - Military Base Protection - Facatativá 2016

Installed rockfall protection barrier GBE-100A-R

 

Sisteme

 

Lungime sistem

50 m

 

Anul instalării

2016

Situația inițială

The Colombian National Army was looking for a system capable of holding back blocks that fell onto one of its facilities. Users and workers at the building were at risk due to the proximity to the slope.

Descriere

WARCO/Geobrugg consulted, supplied and installed a rockfall barrier GBE-100A-R of 50 meters length and 2 meters height.

Client

Ejercito de Colombia

Antreprenor

WARCO S.A.S

Obiect protejat

Clădire

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail