Proteção contra desprendimentos - Industrial Road km 21 2023

General view of the rock fall barrier installed

Proteção contra desprendimentos - Industrial Road km 21 2023

Drilling process of the retention anchors

Proteção contra desprendimentos - Industrial Road km 21 2023

Installation of the post on top of the base plate

Proteção contra desprendimentos - Industrial Road km 21 2023

View of all the post installed

Proteção contra desprendimentos - Industrial Road km 21 2023

ROCCO ring net down slope

Proteção contra desprendimentos - Industrial Road km 21 2023

ROCCO ring net taken down slope of the barrier

Proteção contra desprendimentos - Industrial Road km 21 2023

Side view of the installed barrier

 

Sistemas

 

Comprimento do sistema

- 60 m

 

Ano de instalação

2023

Situação inicial

The channel that transports copper concentrate was exposed to possible rockfalls from a farellon. The breakage of this infrastructure would have great economic and environmental consequences. To mitigate this problem, a project that includes a rock fall barrier was developed. 

Descrição

In order to protect this critical infrastructure, a dynamic barrier with a capacity of  3,000 kJ of energy absorption, 7 meters high and 60 meters long was installed.

Promotor

Objecto protegido

Pedreira/ Minas

Proteção contra a corrosão

Galvanizado, GEOBRUGG SUPERCOATING

Empreteiro

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail