myGeobrugg
640 m
2012
The area where the cars are waiting was endangered from rockfall.
to protect the waiting cars (before they were loaded on to the train through the Lötschbergtunnel), 640 m Barriers were installed. The absorbtion-energies go up to 5000 kJ (16 t with >90 km/h).
BLS AG
.
Estrada, Caminho de ferro, Edifício
Galvanizado, GEOBRUGG SUPERCOATING
.