Trek route to Shri Mata Vaishno Devi Shrine (1)

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

GBE-3000A rockfall barrier protecting pilgrims' route to Shri Mata Vaishno Devi Shrine

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Target of all pilgrims - Holy Cave located in the folds of the three peaked mountain named Trikuta

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Existing, stiff rockfall canopies were not able to withstand rockfalls existing along the trek and had to be extra protected by rockfall barriers

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Density of rockfalls was quite big, here smaller ones

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

The area was constantly endangered by rockfalls

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

GBE-3000A and RXE-8000 rockfall barriers during installation - visible the route trek below, adjacent to steep rock face

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Installation of the RXE-8000 rockfall barrier in progress

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

RXE-8000 rockfall barrier after installation protecting the trek route below from the biggest rockfalls

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

RXE-5000 rockfall barrier after installation protecting the trek route below

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Closer look on GBE-3000A rockfall barrier after installation

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

GBE-3000A after installation - visible smaller rockfalls already stopped by the barrier

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Some areas required extra active slope stabilization using high-tensile steel wire mesh TECCO® G65/3 and QUAROX® net

Protección contra caídas de rocas - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

GBE-3000A rockfall barriers protecting the route trek below, adjacent to steep rock face

 

Longitud del sistema

25 m - 110 m

 

Año de instalación

2016

Situación inicial

There had been several cases of rockfall and landslides in the trek route of the Holy Shrine of Mata Vaishno Devi. Therefore, the Shrine Board decided to actively stabilize the 75º and higher steep slope, up to a maximum height of 70 m in this section. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, tilting as well as sliding of individual blocks and rockfalls.

Descripción

The flexible slope stabilization system consists of TECCO® G65/3 high-tensile steel wire mesh and QUAROX® rolled cable net, system spike plates and soil nails has been selected. Spike plates which match the load capacity of the mesh serve to fix the mesh to soil or rock nails. By tensioning these nails, and recessing the spike plates into the ground, the mesh is adequately tensioned to ensure it follows the surface contours.

Based on the survey results, the authorities also decided to apply a rockfall protection barriers from Geobrugg. With its ring nets made of high-tensile steel wire the barrier design has been tested and approved to absorb impact energies of up to 8000 kJ. A total number of 15 barriers were installed in different locations with energy absorption capacity ranging from 3000 kJ up to 8000 kJ.

See also our slope project Trek route to Shri Mata Vaishno Devi Shrine (2)

Cliente

Shri Mata Vaishno Devi Shrine Board

Ingeniería

Tehri Hydro Development Corporation Ltd

Subcontratista

Pioneer Foundation Engineers Pvt Ltd

Objeto protegido

Carretera, Edificio, Infraestructura turística, Infraestructura, Arquitectura, Otros

Protección contra la corrosión

Galvanizado, GEOBRUGG SUPERCOATING

Su contacto local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / EE. UU. Regional Manager Northeast

Correo electrónico

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / EE. UU. Regional Manager California

Correo electrónico

John Kalejta
 

John Kalejta

Regional Manager Central US

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / EE. UU. Regional Manager Central US

Correo electrónico

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / EE. UU. Regional Manager Southeast

Correo electrónico

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Protección contra riesgos naturales
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Correo electrónico

Tim Shevlin
 

Tim Shevlin

Sales Director

Protección contra riesgos naturales
Geobrugg North America, LLC,Salem OR 97302 / EE. UU. Sales Director

Correo electrónico