EE. UU.
EE. UU.

myGeobrugg

Estabilización de taludes - Selo Boyolali 2016

The TECCO® high tensile steel wire mesh stabilizes the steep Lahar slope. Vegetation is already covering the steep hill. The anchored concrete beam at the top absorbs the traffic load and acts as a stiffening element.

Estabilización de taludes - Selo Boyolali 2016

Rolling down the TECMAT® erosion control and the TECCO® high tensile steel wire net. Diamond shaped spike plates attach the net. Due to the optimized nail pattern, this took only a couple of days.

Estabilización de taludes - Selo Boyolali 2016

The completed TECCO® slope stabilization. It took the team only four months - congratulations!

Estabilización de taludes - Selo Boyolali 2016

Frontal view onto the impressive bamboo scaffold: traditional methods meeting newest technologies

Estabilización de taludes - Selo Boyolali 2016

The entirely green, completely revegetated slope in 2020

 

Año de instalación

2016

Situación inicial

Jembatan Samiran road lies approximately 35 kilometers west from Surakarta. The road widening project that connects Magelang and Boyolali cuts travel time and helps to spur economic growth in the area. In the past, the operation got constraint massively by the occurrence of large slope failure, in which one road lane slipped down to the creek. The site is troublesome due to its steepness and geological condition, due to the intense rainy season and frequent earthquakes.

The road engineers decided on a new effective solution, tested and withstanding the harshness of the site, actively and permanently stabilizing the problematic embankment. Quickly and safely installed in respect of the challenging accessibility. Moreover, blending in with nature: TECCO® System.

TECCO® System is a permanent and active slope stabilization system made of high tensile steel wire mesh in combination with soil nailing or rock bolting.

Geología

Lahar

Descripción

After the stakeout in collaboration with local experts and Geobrugg engineers, five hardworking drilling team completed drilling works in less than four months. Given the demanding weather conditions, this is an astonishing performance.

2'500 sqm of slope stabilization with TECCO® System mesh and hydroseeding were completed within two weeks.


Green Rehabilitator, the expert in landscape & erosion control services from Semarang, executed the hydroseeding.

Cliente

Bina Marga

Objeto protegido

Carretera, Infraestructura turística

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Otras empresas participantes

PT. Amavi

Su contacto local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / EE. UU. Regional Manager Northeast

Correo electrónico

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / EE. UU. Regional Manager California

Correo electrónico

John Kalejta
 

John Kalejta

Regional Manager Central US

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / EE. UU. Regional Manager Central US

Correo electrónico

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / EE. UU. Regional Manager Southeast

Correo electrónico

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Protección contra riesgos naturales
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Correo electrónico

Tim Shevlin
 

Tim Shevlin

Sales Director

Protección contra riesgos naturales
Geobrugg North America, LLC,Salem OR 97302 / EE. UU. Sales Director

Correo electrónico