EE. UU.
EE. UU.

myGeobrugg

Minería / Túneles - Hemlo Mine 2020

The complete installation: the rockfall barrier in the background (middle), underneath the stabilized rockface (TECCO® mesh), two attenuators at the sides

Minería / Túneles - Hemlo Mine 2020

Interception part of one of the customized attenuators: the rigid posts permit the absence of retaining ropes, leaving the berm free to access, example for maintenance works.

 

Año de instalación

2020

Situación inicial

Hemlo has produced more than 21 million ounces of gold and has been operating continuously for more than 30 years. It consists of the Williams mine — an underground and open pit operation — located about 350 kilometers east of Thunder Bay, Ontario. Potential rockfall hazards at the tunnel portal led the mine to contact Geobrugg NA LLC. for advice on mitigation solutions.

GeoStabilization International (GSI) chose an attenuator solution as the most efficient and cost-effective for open pit mining.

Descripción

Geobrugg worked closely with the mine and the installation contractor GeoStabilization International (GSI) to manage the rockfall hazards. 

The works consist of:

  • two attenuators totaling 70 meters of MINAX® 80/4 mesh
  • one GBE-1000A-R kJ barrier
  • one anchored TECCO® G65/3 mesh system.

During the installation of the different solutions, all mining activities continued with no interruption.

Cliente

Objeto protegido

Cantera/ Mina, Infraestructura

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Ingeniería

BARRICK/ Advised by GeoStabilization International (GSI) and Geobrugg N. A. LLC

Otras aplicaciones instaladas

Protección contra caídas de rocas, Estabilización de taludes, Minería / Túneles

Su contacto local

Dane Wagner
 

Dane Wagner

Open Pit Mining / Quarries Business Development Manager

Minería / Túneles
Geobrugg North America, LLC,10700 SW Beaverton Hillsdale Hwy, Suite #470-1,97005 Beaverton / EE. UU. Open Pit Mining / Quarries Business Development Manager

Correo electrónico