EE. UU.
EE. UU.

myGeobrugg

Minería / Túneles - City of Atlanta Water Supply 2016

Northerly view of quarry slope to be protected - visible preparations for TBM deployment. Photo thanks to courtesy of Scarptec Inc.

Minería / Túneles - City of Atlanta Water Supply 2016

Installation of high tensile steel TECCO® G65/3 drape. Photo thanks to courtesy of Scarptec Inc.

Minería / Túneles - City of Atlanta Water Supply 2016

Another perspective of drape system being installed. Note painted drilling point for rock bolts used to secure larger boulder. Photo thanks to courtesy of Scarptec Inc.

Minería / Túneles - City of Atlanta Water Supply 2016

View of GBE-1000A rockfall barrier line serving as rockfall canopy directly above TBM entry portal. TECCO® drape secured locally to capture rocks. Photo thanks to courtesy of Scarptec Inc.

Minería / Túneles - City of Atlanta Water Supply 2016

View from below of the GBE-1000A rockfall barrier with hinged posts allowing easy slope morphology adjustments. Photo thanks to courtesy of Scarptec Inc.

 

Año de instalación

2016

Situación inicial

Bellwood Quarry outside of Atlanta (GA) will now be used for City of Atlanta water supply. In preparation to house the water supply and construct the distribution tunnel system a temporary and permanent system needed to be designed to protect workers, equipment and infrastructure from rocks falling off the 315 ft high and 365 ft long north facing slope. An additional temporary solution also needed to be implemented to protect workers and equipment at the tunnel portal.

Descripción

The solution was a 114 000 ft² TECCO® G65/3 drape system and two GBE-1000A rockfall barriers forming canopies. The challenge was to provide a feasible and cost effective solution that could be strong enough to contain rocks 2.5 ft in diameter falling from 285 ft. The system had to be strong yet light weight enough for effective installation. The GBE-1000A systems were bolted to the rockface with the TECCO® G65/3 drape tied locally to ensure capture of the rock. Larger boulders were secured with rock bolts to reduce system requirements. The drape will be left after the site is filled to contain underwater rockfall. The canopies will be removed. 

Learn more about the project: 
City of Atlanta Department of Watershed management (YouTube)

País / Región

EE. UU.

Cliente

City of Atlanta

Ingeniería

Scarptec Inc.

Subcontratista

Guy F. Atkinson Construction LLC

Otras empresas participantes

Apex Rockfall, LLC

Objeto protegido

Cantera/ Mina, Infraestructura

Protección contra la corrosión

Galvanizado, GEOBRUGG SUPERCOATING

Su contacto local

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / EE. UU. Regional Manager Northeast

Correo electrónico

Saleh Feidi, Regional Manager California
 

Saleh Feidi

Protección contra riesgos naturales
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / EE. UU. , Regional Manager California

Correo electrónico

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Protección contra riesgos naturales
Geobrugg North America, LLC,KS 67226 Wichita / EE. UU. Regional Manager Rocky Mountains / Central USA

Correo electrónico

Bob Lyne
 

Bob Lyne

Regional Sales Manager Southeast

Protección contra riesgos naturales
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / EE. UU. Regional Sales Manager Southeast

Correo electrónico

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Protección contra riesgos naturales
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Correo electrónico

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Protección contra riesgos naturales
Geobrugg North America, LLC,OR 97302 Salem / EE. UU. Regional Sales Manager Pacific Northwest and Hawaii

Correo electrónico