Protección contra caídas de rocas - Balmi-Tschuggen 2015

View from the protected road of two barriers: On the line 1.1 (2000 kJ, H = 6 m) installed on the bare rock face and on the line 1.7 (2000 kJ, H = 5 m) installed on a very steep and high slope.

Protección contra caídas de rocas - Balmi-Tschuggen 2015

Technical pre-approval of the line 1.2 (1500 kJ, H = 6 m).

Protección contra caídas de rocas - Balmi-Tschuggen 2015

View from above the line 1.3 (1000 kJ, H = 6 m).

Protección contra caídas de rocas - Balmi-Tschuggen 2015

In anticipation of small diameter falling rocks on the line 1.2 (1500 kJ, H = 6 m), a very fine secondary mesh was installed (25 mm x 25 mm) along with the barrier.

Protección contra caídas de rocas - Balmi-Tschuggen 2015

View of heavy traffic and the rockfall barrier protecting the road from above the 1.2 line.

Protección contra caídas de rocas - Balmi-Tschuggen 2015

The very same day of installation acceptance by the customer (ASTRA - Federal Roads Office), several blocks were successfully retained by the line 1.9 (2000 kJ H = 5 m, adapted to withstand snow pressure).

Protección contra caídas de rocas - Balmi-Tschuggen 2015

View of the lines 1.9, 2.0 and 2.2 (all 2000 kJ, H = 5 or 6 m). Due to their location, they are also adapted to withstand snow pressure.

Protección contra caídas de rocas - Balmi-Tschuggen 2015

Impact October 2019 and the protected road

Protección contra caídas de rocas - Balmi-Tschuggen 2015

Rockfall impact October 2019

Protección contra caídas de rocas - Balmi-Tschuggen 2015

Successful rockfall protection

Protección contra caídas de rocas - Balmi-Tschuggen 2015

" ... blocks of about 3.5 Cubic meter ..." (Jungfrau Zeitung, November 1st, 2019)

 

Longitud del sistema

16 m - 80 m

 

Año de instalación

2015

Situación inicial

The existing rockfall barriers above national highway A8 over the Brünig Pass were greatly weakened after years of prevalent heavy snowfalls and had to be replaced. Therefore, the Swiss Federal Roads Office (ASTRA) in 2014 invited IMPULS AG to consult the new project (installed by Gasser Felstechnik AG).

Descripción

A total of eleven lines* with energy absorption capacities between 1,000 and 2,000 kJ were installed:

1000 kJ: height = 6 m, length = 30 m

1500 kJ: height = 6 m, length = 56 m

2000 kJ: height = 5 m and 6 m, length = 122 m

In addition, five lines were dimensioned for rockfall as well as for snow slide so that multi-hazard barriers  were installed:


2000
kJ: height = 5 m and 6 m, length = 139 m

* The RXI barriers used are now superseded by the RXE barriers.

Cliente

Bundesamt für Strassen (ASTRA)

Subcontratista

Gasser Felstechnik AG

Objeto protegido

Carretera

Protección contra la corrosión

Galvanizado

Ingeniería

IMPULS AG

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico