Estados Unidos
Estados Unidos

myGeobrugg

Sipplingen cycle path and road B31

Estabilização de taludes - Sipplingen cycle path and road B31 2016

Overview of the slope and adjacent infrastructure after nailing and TECCO® SYSTEM³ stabilization works

Estabilização de taludes - Sipplingen cycle path and road B31 2016

Slope failure causing huge transport infrastructure interruption

Estabilização de taludes - Sipplingen cycle path and road B31 2016

Landslide area after the removal of failed material

Estabilização de taludes - Sipplingen cycle path and road B31 2016

Drilling of the soil nails - visible temporary wooden wall which allowed to have the road open

Estabilização de taludes - Sipplingen cycle path and road B31 2016

Slope stabilized with nailing and TECCO® SYSTEM3 as a protection of cycling path, federal road and railway line

 
 

Ano de instalação

2016

Situação inicial

Ludwigshafen and Sipplingen at the Lake Constance are connected by a railway line, the federal road B31 and a cycle path. At the narrowest points the slope was cut and stabilized by a retaining wall for the bike path. In May 2016 the slope above failed. In the area of the retaining wall, movements in the embankment occurred in 2006 and 2012. In addition, in the years 2013 and 2015 further landslides occurred at the north-west end.

Geologia

Siltstones, sandstones and marlstones

Descrição

Due to existing threat of the landslide, the road and the cycling path were closed. The railway line stayed open but with a speed limit because it could also be affected by sliding trees. After the first cleaning works an extra wooden wall above the retaining wall was built to allow the road opening. The cycling path remained closed the entire time during stabilization works.

The long detours had a negative influence on the turism so local population was pushing for a good, longlasting solution. By the end of June 2016. after completion of the cleaning works, the final area requiring stabilization was defined,

Promotor

Landratsamt Bodenseekreis

Contratante

FSS Felssicherung Inh. Siegfried Simon

Objecto protegido

Estrada, Caminho de ferro, Infra-estrutura turística

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

Landesamt für Geologie, Rohstoffe und Bergbau

O seu contacto local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Estados Unidos Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Estados Unidos Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Estados Unidos Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Estados Unidos Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Riscos naturais
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Riscos naturais
Geobrugg North America, LLC,Salem OR 97302 / Estados Unidos Sales Director

E-mail