США
США

myGeobrugg

Селевые потоки и микросели - Test Site Stream Lobental 2007

Test barrier under full load - visible pieces of wood stopped by the barrier, without blocking water flow

Селевые потоки и микросели - Test Site Stream Lobental 2007

Pieces of wood were deposited along the stream before water was release from the upper lake

Селевые потоки и микросели - Test Site Stream Lobental 2007

Overview of the test barrier - ancestor of Geobrugg's Debris Flow Barriers. Visible load cells and their signal cables

Селевые потоки и микросели - Test Site Stream Lobental 2007

Load cells data were stored and analyzed directly on site

Селевые потоки и микросели - Test Site Stream Lobental 2007

Test barrier under full load - visible pieces of wood stopped by the barrier, without blocking water flow

Селевые потоки и микросели - Test Site Stream Lobental 2007

Front view of the test barrier under full load - visible pieces of wood stopped by the barrier, without blocking water flow

Селевые потоки и микросели - Test Site Stream Lobental 2007

View of the barrier during test from the upper lake side - barrier was fully loaded, incl. overflow

Селевые потоки и микросели - Test Site Stream Lobental 2007

Test barrier after the test - was able to stop the whole amount of wood without any failure, allowing full dewatering at the same time

Селевые потоки и микросели - Test Site Stream Lobental 2007

Stopped mass of wood after test - fully dewatered and ready to be removed

 

Длина системы

7 m - 7 m

 

Год установки

2007

Ситуация

For many years, the Bavarian Water Resources Administration used rope nets to entrap the wooden debris. The advantage of this construction is:
• simple building equipment can be used
• commercial components and common techniques can be used
• rope nets are inconspicuous and almost do not disturb the landscape.

The main structure to bear the forces consists of ropes, which are spanned across to the flow direction over the torrent. The nets have a distance of about 0,50 to 1,0 meter to the river bed so that smaller floods without wooden debris and bedload can pass unhindered.

The research project was carried out at the Institute for Hydraulic an Engineering at Technische Universität München, to answer the following questions:

• How is the process of the entrapment in rope dams proceeding?
• Which forces occur and what are the main parameters of influence?
• Which recommendations for the construction of net-dams can be given?

Описание

In different model tests the entrapment process was analysed and the main parameters of influence were worked out. Furthermore a full-scale nature test on rope net barriers was realized to investigate dynamic loads in the beginning of the entrapment process and to work out the influence of elasticity. Significant for the design are only the static loads, which in nature are about 20 to 30 % higher then in model due to a greater volume of fine material with less dimension and sagging ropes respectively nets. The function of the net barriers was proved. The results lead to a design concept for rope net barriers.

Клиент

Wasserwirtschaftsämter Weilheim und Kempten

Подрядчик

Bremer Schutz-Verbauungen GmbH

Защищаемый объект

Дорога, Железнодорожная линия, Строительство, Kарьер / Шахта, Туристическая инфраструктура, Жилой район, Инфраструктура, Архитектура, Искусство, Другое

Защита от коррозии

Оцинковка, GEOBRUGG SUPERCOATING

Проектировщик

Technical University Munich / Geobrugg AG

Представитель в Вашем регионе

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / США Regional Manager Northeast

Электронная почта

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / США Regional Manager California

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Central US

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / США Regional Manager Central US

Электронная почта

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / США Regional Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Sales Director

Инженерная защита
Geobrugg North America, LLC,Salem OR 97302 / США Sales Director

Электронная почта