İsviçre
İsviçre

myGeobrugg

Tramway du Mont Blanc - Nid d'Aigle

Kaya düşmesine karşı koruma - Tramway du Mont Blanc - Nid d'Aigle 2022

Canopy system protecting the railway

Kaya düşmesine karşı koruma - Tramway du Mont Blanc - Nid d'Aigle 2022

Vue latérale de l'ouvrage

 

Sistemler

 

Sistem uzunluğu

70 m

 

Kurulum Yılı

2022

Durum

At the tunnel entrance, just before the Nid d'Aigle arrival station, the Mont Blanc Tramway passes the foot of a cliff subject to rock falls. 

Açıklama

The installation of a CANOPY deflector structure (self-cleaning up to 500 kJ) on a 70 meters long line, in addition to a wire mesh placed on the lower part of the rockface, allowed to secure the site.

Yüklenici

Gösterilen obje

Railway

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta