Spergau - dam protection against badger

Şev ve Yamaç koruma - Spergau - dam protection against badger 2024

Railroad embankment with TECCO® G65/3 mesh as protection against burrowing animals (badger)

Şev ve Yamaç koruma - Spergau - dam protection against badger 2024

View of embankment shoulder - transition edge path

Şev ve Yamaç koruma - Spergau - dam protection against badger 2024

Detail of suspension of upper suspension cable using spiral cable anchor

Şev ve Yamaç koruma - Spergau - dam protection against badger 2024

View of embankment foot - integration of existing trees

Şev ve Yamaç koruma - Spergau - dam protection against badger 2024

Detail tree section

 

Sistemler

 

Kurulum Yılı

2024

Durum

Rail infrastructure must meet appropriate safety criteria to ensure smooth and punctual passenger and freight transport. With a nationwide rail network of almost 40,000 kilometers, this is a challenge. In addition to traditional engineering structures such as bridges, retaining structures and tunnels, earthworks are an essential part of the railroad infrastructure. Compared to roads, the issue of subsidence poses an even more severe problem for rail transport routes: detours are virtually impossible during rail operations, and slow speeds or even closures usually have a massive impact on the timetable.

Native burrowing animals and rodents such as beavers, nutria and badgers can be found almost everywhere in Germany. Their habitats often border directly on traffic routes. If these animals dig their burrows in dams or dykes, this can lead to subsidence, landslides or even loss of stability, depending on the extent of the cavity formation. Whether the structure is used for traffic, flood protection or other purposes, far-reaching consequences for people, nature and infrastructure are possible.

Açıklama

The surface of the dam was covered with steel wire mesh to prevent cavities from being dug. Compared to a classic slope stabilization with the TECCO system, the anchoring points were reduced to a minimum due to the lower static requirements. This enabled fast, economical and environmentally friendly construction.

Care was taken to ensure the badger burrows had been abandoned at installation time. In some areas, the netting was combined with permanent nailing to increase the dam’s stability. To protect the environment as much as possible, the existing trees in the embankment area were integrated into the netting and not felled.

Müşteri

Anlagen- und Instandhaltungsmanagement Netz Halle, DB Netz AG

Korozyon koruması

GEOBRUGG SUPERCOATING

Kurulan diğer uygulamalar

Hidrolik mühendislik

Yerel yetkiliniz

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Amerika Birleşik Devletleri Regional Manager Northeast

e-posta

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Amerika Birleşik Devletleri Regional Manager California

e-posta

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Amerika Birleşik Devletleri Regional Manager Central US

e-posta

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Amerika Birleşik Devletleri Regional Manager Southeast

e-posta

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

e-posta

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / Amerika Birleşik Devletleri Sales Director

e-posta