Amerika Birleşik Devletleri
Amerika Birleşik Devletleri

myGeobrugg

Kaya düşmesine karşı koruma - Grasberg Mine 2015

RXE-8000 rockfall barrier protecting mill facility in the background

Kaya düşmesine karşı koruma - Grasberg Mine 2015

Installation works in progress - visible special combined posts allowing helicopter transport

Kaya düşmesine karşı koruma - Grasberg Mine 2015

Slope morphology required reliable protection against 8000 kJ rockfalls and a height of 9 meters

Kaya düşmesine karşı koruma - Grasberg Mine 2015

Finally, a 50 meters long rockfall protection was installed

Kaya düşmesine karşı koruma - Grasberg Mine 2015

Overview of the Grasber Mine mill area

Kaya düşmesine karşı koruma - Grasberg Mine 2015

Drilling works required good preparation and special equipment suspended on ropes

Kaya düşmesine karşı koruma - Grasberg Mine 2015

Because of the size and helicopter transportation limits, posts were delivered in pieces, being screwed together directly on site

Kaya düşmesine karşı koruma - Grasberg Mine 2015

RXE-8000 middle post pieces being transported by the helicopter - visible project specific screw flanges

Kaya düşmesine karşı koruma - Grasberg Mine 2015

9 meters high RXE-8000 rockfall barrier installed across a natural gully

 

Sistemler

 

Sistem uzunluğu

50 m - 50 m

 

Kurulum Yılı

2015

Durum

Rockfall hazard from the natural slopes above the mill area within the Grasberg mine had to be mitigated. After several incidents with boulders hitting buildings and infrastructure a fast and reliable solution had to be found.

Açıklama

The RXE-8000 rockfall barrier was installed across a very active gully on the east side of the mill area. Several rockfall incidents with boulders up to 2 meters in diameter had affected the mill infrastructure before. To ensure safe operation of the mill area below the gully, the barrier was installed approximately 140 meters above office buildings and ore processing facilities.

Müşteri

Freeport-McMoRan Inc.

Yüklenici

PT Freeport Indonesia

Gösterilen obje

Mine / Quarry

Korozyon koruması

Galvanized, GEOBRUGG SUPERCOATING

Mühendislik

Geobrugg

Alt yüklenici

RPT-Indonesia

Kurulan diğer uygulamalar

Madencilik / Tüneller

Yerel yetkiliniz

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Amerika Birleşik Devletleri Regional Manager Northeast

e-posta

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Amerika Birleşik Devletleri Regional Manager California

e-posta

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Amerika Birleşik Devletleri Regional Manager Central US

e-posta

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Amerika Birleşik Devletleri Regional Manager Southeast

e-posta

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

e-posta

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / Amerika Birleşik Devletleri Sales Director

e-posta