İsviçre
İsviçre

myGeobrugg

Fierza Hydroelectric Power Station #1

Kaya düşmesine karşı koruma - Fierza Hydroelectric Power Station #1 2014

Barrier RXI-100 installed on the slope.

Kaya düşmesine karşı koruma - Fierza Hydroelectric Power Station #1 2014

Barrier TXI-010 with installed fixed posts (visible lack of space for retaining ropes).

Kaya düşmesine karşı koruma - Fierza Hydroelectric Power Station #1 2014

Fully installed TXI-010 barrier directly next to the road.

Kaya düşmesine karşı koruma - Fierza Hydroelectric Power Station #1 2014

Some installation required helicopter usage.

 

Sistem uzunluğu

15 m - 80 m

 

Kurulum Yılı

2014

Durum

Rockfalls endangered the roads around Fierza hydroelectric power station.

Açıklama

Rockfall protection with TXI-010 barriers (system with no retaining ropes) and RXI-100 barriers.

As seen in the photos, parts of the project were installed by helicopter, clearly demonstrating how lightweight Geobrugg's systems are.

Müşteri

KESH Albania

Yüklenici

Cresta Geo Switzerland

Gösterilen obje

Road, Building

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta