Şev ve Yamaç koruma - Cwmavon Landslide 2018

Completed site image from the south of site.

Şev ve Yamaç koruma - Cwmavon Landslide 2018

Slope after failure and cleaning

Şev ve Yamaç koruma - Cwmavon Landslide 2018

Site after tree clearance

Şev ve Yamaç koruma - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

Şev ve Yamaç koruma - Cwmavon Landslide 2018

Skid drill rig installing soil nails

Şev ve Yamaç koruma - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

Şev ve Yamaç koruma - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

Şev ve Yamaç koruma - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

Şev ve Yamaç koruma - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 

Kurulum Yılı

2018

Durum

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

Jeoloji

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

Açıklama

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

Müşteri

Neath Port Talbot county borough council

Yüklenici

Quantum Geotechnical

Gösterilen obje

Road, Residential area, Infrastructure

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Remedy Geotechnics

Alt yüklenici

iBEX technical access

Yerel yetkiliniz

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Amerika Birleşik Devletleri Regional Manager Northeast

e-posta

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Amerika Birleşik Devletleri Regional Manager California

e-posta

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Amerika Birleşik Devletleri Regional Manager Central US

e-posta

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Amerika Birleşik Devletleri Regional Manager Southeast

e-posta

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

e-posta

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / Amerika Birleşik Devletleri Sales Director

e-posta