Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

A 1,1 km long Shallow Landslide Barrier protects the road at Bulli Pass in New South Wales.

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Placing concrete for post footings ©NSW Government

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Overview of work site ©NSW Government

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Site preparation ©NSW Government

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Installation of barrier mesh fencing ©NSW Government

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Work near satefy ramp ©NSW Government

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Installed posts and footings ©NSW Government

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Cranes lifting rock fall protection barrier components into position above Bulli Pass ©NSW Government

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Precast concrete pad footings for the rockfall protection barrier posts ©NSW Government

Kaya düşmesine karşı koruma - Bulli Pass (1) 2017

Rear side of the barrier with brakes

 

Sistem uzunluğu

1100 m

 

Kurulum Yılı

2017

Durum

The Wollongong Escarpment Area in Wollongong New South Wales is unstable and Bulli Pass is subject to rockslides especially in times of heavy rainfall. Bulli Pass has a history of slip and rock fall events. A major slip in 2008 required slope stabilisation works with the road being closed for seven weeks. Following several events, including a serious rock fall that landed on a vehicle in 2015, there have been extensive investigations into the upslope section of Bulli Pass.  After detailed analysis Geobrugg Australia was chosen as the preferred supplier of a Rock Fall and Landslide mitigation system.

Açıklama

The project reduces the residual slope risk profile from landslide and rock fall events. The project consisted of a 1.1 km of SL-150 Shallow Landslide Barrier and a combination of VX and UX Shallow Landslide Barriers.  The system now provides rock fall and landslide protection from a road that has 12000 car movements a day.  The barrier is 3,5 m high including over 1000 rock nail anchors constructed in difficult terrain. The Barrier is also capable of containing a 500 kg rock travelling at 160 km/hour.

More information:

- Roads & Maritime, New South Wales

Müşteri

Roads and Maritime Authority, New South Wales

Yüklenici

Specialised Geo Pty Ltd (GHD Contractor)

Gösterilen obje

Road

Korozyon koruması

GEOBRUGG ULTRACOATING

Mühendislik

Department of Public Works, (Project Management)

Alt yüklenici

Consultant Andrew Hunter Coffey/GHD (Geotechnical Consultant); Consultant Philip Flentje (University of Wollongong)

Kurulan diğer uygulamalar

Moloz akışına ve heyelana karşı koruma

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta