İsviçre
İsviçre

Borusan EnBW

Ispir Erzurum, Türkiye
2019
Müşteri
Borusan EnBW
Mühendislik
Geobrugg AG
Yüklenici
Artusa Geohazard
Gösterilen obje
Other
Sistem boyu
6.0 m
Sistem uzunluğu
15 m
Korozyon koruması
GEOBRUGG SUPERCOATING®
Bariyer sayısı
1
Tutma kapasitesi
3000 m³
Durum

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

Açıklama

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

Yerel yetkiliniz

Roger Moor
Roger Moor
Ost- und Zentralschweiz, Liechtenstein - Country Manager
Natural Hazards, Mining / Tunnels
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / İsviçre
René Müller
René Müller
Country Manager Western Switzerland (AG, BE, BL, BS, FR, GE, JU, NE, SO, VD, VS)
Natural Hazards, Mining / Tunnels
Geobrugg AG
Industriestrasse 21
5200 Brugg / İsviçre
Isacco Toffoletto
Isacco Toffoletto
Country Manager Southern Switzerland (TI)
Natural Hazards, Mining / Tunnels
Geobrugg AG
Via Pizzante 7
6595 Riazzino / İsviçre
Jonas von Wartburg
Jonas von Wartburg
Country Manager Western Switzerland/Scandinavia
Natural Hazards, Mining / Tunnels
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / İsviçre