스위스
스위스

myGeobrugg

비탈면 보강 시스템 - Schmerikon State Road 17 2013

Bird's eye view of the protected objects: State roadway, railway, bicycle path, building and port

비탈면 보강 시스템 - Schmerikon State Road 17 2013

Slope failure seen shortly after the emergency work began a few days after the incident in June 2013

비탈면 보강 시스템 - Schmerikon State Road 17 2013

Spider excavator during drilling

비탈면 보강 시스템 - Schmerikon State Road 17 2013

Drilling along the top edge of the failed slope

비탈면 보강 시스템 - Schmerikon State Road 17 2013

Drilling with manual equipment

비탈면 보강 시스템 - Schmerikon State Road 17 2013

View of the upper section showing nailed TECCO G65/3, P33 spike plates and border rope

비탈면 보강 시스템 - Schmerikon State Road 17 2013

Location: Zürichsee, Switzerland Federal Office of Topography, Bern, Switzerland National Map 1:50'000

 
 

Year of installation

2013

Situation

In the first days of June 2013 heavy storms and intense rainfall hit the region of the upper lake of Zurich. Due to saturation of the ground and instable geological conditions, a landslide buried a long section of heavily travelled commuter roadway and railway along the lake. This landslide caused complete closure of the infrastructure.

Geology

Top Section: weathered marl

Bottom section: weathered sandstone / siltstone

Description

The department for underground construction initiated re-establishment and sustainable prevention of future similar incidents a few days later. To reach a quick decision and accelerate the construction, the department quickly involved local and regional partners.

Solutions discussed were rockfall barrier, manifold, or anchored TECCO® System the most favorable and ultimately chosen solution.

The upper slope section (marl) was protected and stabilized using a nailed mesh. The lower sandstone/siltstone section was covered with a drape to ensure that falling debris is kept close to the slope while being guided and deposited to the ditch.

Customer

State Department for Underground Engenieering, Canton St.Gallen

Contractor

Oberholzer Bauleistungen Inc., Neuhaus, Switzerland

Protected object

Road, Railway, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Dr. A. Gübeli AG, Jona, Switzerland

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail