США
США

myGeobrugg

Укрепление склонов - Spergau - dam protection against badger 2024

Railroad embankment with TECCO® G65/3 mesh as protection against burrowing animals (badger)

Укрепление склонов - Spergau - dam protection against badger 2024

View of embankment shoulder - transition edge path

Укрепление склонов - Spergau - dam protection against badger 2024

Detail of suspension of upper suspension cable using spiral cable anchor

Укрепление склонов - Spergau - dam protection against badger 2024

View of embankment foot - integration of existing trees

Укрепление склонов - Spergau - dam protection against badger 2024

Detail tree section

 

Системы

 

Год установки

2024

Ситуация

Rail infrastructure must meet appropriate safety criteria to ensure smooth and punctual passenger and freight transport. With a nationwide rail network of almost 40,000 kilometers, this is a challenge. In addition to traditional engineering structures such as bridges, retaining structures and tunnels, earthworks are an essential part of the railroad infrastructure. Compared to roads, the issue of subsidence poses an even more severe problem for rail transport routes: detours are virtually impossible during rail operations, and slow speeds or even closures usually have a massive impact on the timetable.

Native burrowing animals and rodents such as beavers, nutria and badgers can be found almost everywhere in Germany. Their habitats often border directly on traffic routes. If these animals dig their burrows in dams or dykes, this can lead to subsidence, landslides or even loss of stability, depending on the extent of the cavity formation. Whether the structure is used for traffic, flood protection or other purposes, far-reaching consequences for people, nature and infrastructure are possible.

Описание

The surface of the dam was covered with steel wire mesh to prevent cavities from being dug. Compared to a classic slope stabilization with the TECCO system, the anchoring points were reduced to a minimum due to the lower static requirements. This enabled fast, economical and environmentally friendly construction.

Care was taken to ensure the badger burrows had been abandoned at installation time. In some areas, the netting was combined with permanent nailing to increase the dam’s stability. To protect the environment as much as possible, the existing trees in the embankment area were integrated into the netting and not felled.

Страна / Регион

Германия

Клиент

Anlagen- und Instandhaltungsmanagement Netz Halle, DB Netz AG

Защищаемый объект

Железнодорожная линия

Защита от коррозии

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / США Regional Manager Northeast

Электронная почта

Saleh Feidi, Regional Manager California
 

Saleh Feidi

Инженерная защита
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / США , Regional Manager California

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Инженерная защита
Geobrugg North America, LLC,KS 67226 Wichita / США Regional Manager Rocky Mountains / Central USA

Электронная почта

Bob Lyne
 

Bob Lyne

Regional Sales Manager Southeast

Инженерная защита
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / США Regional Sales Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Инженерная защита
Geobrugg North America, LLC,OR 97302 Salem / США Regional Sales Manager Pacific Northwest and Hawaii

Электронная почта