Укрепление склонов - Spergau - dam protection against badger 2024

Railroad embankment with TECCO® G65/3 mesh as protection against burrowing animals (badger)

Укрепление склонов - Spergau - dam protection against badger 2024

View of embankment shoulder - transition edge path

Укрепление склонов - Spergau - dam protection against badger 2024

Detail of suspension of upper suspension cable using spiral cable anchor

Укрепление склонов - Spergau - dam protection against badger 2024

View of embankment foot - integration of existing trees

Укрепление склонов - Spergau - dam protection against badger 2024

Detail tree section

 

Системы

 

Год установки

2024

Ситуация

Rail infrastructure must meet appropriate safety criteria to ensure smooth and punctual passenger and freight transport. With a nationwide rail network of almost 40,000 kilometers, this is a challenge. In addition to traditional engineering structures such as bridges, retaining structures and tunnels, earthworks are an essential part of the railroad infrastructure. Compared to roads, the issue of subsidence poses an even more severe problem for rail transport routes: detours are virtually impossible during rail operations, and slow speeds or even closures usually have a massive impact on the timetable.

Native burrowing animals and rodents such as beavers, nutria and badgers can be found almost everywhere in Germany. Their habitats often border directly on traffic routes. If these animals dig their burrows in dams or dykes, this can lead to subsidence, landslides or even loss of stability, depending on the extent of the cavity formation. Whether the structure is used for traffic, flood protection or other purposes, far-reaching consequences for people, nature and infrastructure are possible.

Описание

The surface of the dam was covered with steel wire mesh to prevent cavities from being dug. Compared to a classic slope stabilization with the TECCO system, the anchoring points were reduced to a minimum due to the lower static requirements. This enabled fast, economical and environmentally friendly construction.

Care was taken to ensure the badger burrows had been abandoned at installation time. In some areas, the netting was combined with permanent nailing to increase the dam’s stability. To protect the environment as much as possible, the existing trees in the embankment area were integrated into the netting and not felled.

Клиент

Anlagen- und Instandhaltungsmanagement Netz Halle, DB Netz AG

Защита от коррозии

GEOBRUGG SUPERCOATING

Другие конструкции

Берегоукрепление

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта