Швейцария
Швейцария

myGeobrugg

Мониторинг опасных процессов - Sørøya I 2019

SPIDER® Avalanche protecting the main road of Soroya from Hasvik to Sørvær from avalanches and rockfall

Мониторинг опасных процессов - Sørøya I 2019

The low weight components enable the transport by helicopter

Мониторинг опасных процессов - Sørøya I 2019

The systems are installed close to the shore line

Мониторинг опасных процессов - Sørøya I 2019

Nearly 1500 meters of SPIDER® Avalanche protect the main road from avalanches and rockfalls

Мониторинг опасных процессов - Sørøya I 2019

View on nearly all of the installed systems

Мониторинг опасных процессов - Sørøya I 2019

The netting provides a flexible protective surface which is barely visible from a distance

Мониторинг опасных процессов - Sørøya I 2019

The posts are erected on anchorless pressure plates, which saves time and is particularly advantageous on creeping slopes

 
 

Год установки

2019

Ситуация

On the Norwegian island Sørøya, the main road from Hasvik to Sørvær was threatened by rockfall in the summertime and avalanches during the winter. The road construction authorities decided to undertake sustainable measures to mitigate these hazards for this important road. As the starting zone of the avalanche is situated approximately 200 meters above the route, the installation of the protection system had to be carried out by helicopter.

At this site GUARD monitoring devices are installed as well, read about this installation from 2020.

Описание

The construction company DS Entreprenør AS was commissioned by the Norwegian road construction authorities to evaluate possible solutions. Fjerby decided to install approximately 1400 meters (Dk 3.5) of the Geobrugg SPIDER® Avalanche system. This solution provides rockfall protection with energies up to 500 kJ in the summer as well as avalanche prevention in winter. SPIDER® Avalanche is also hardly visible, which is especially fundamental in the untouched nature of the island Sørøya.

Video of the installation: https://youtu.be/KDb0JmXEbYU

Страна / Регион

Норвегия

Подрядчик

Защищаемый объект

Дорога, Туристическая инфраструктура, Инфраструктура

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Инженерная защита
Гидротехника
Геобругг АГ,Aachstrasse 11,8590 Romanshorn / Швейцария , Msc. Env. Eng.

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Швейцария Country Manager Southern Switzerland

Электронная почта