Укрепление склонов - Selo Boyolali 2016

The TECCO® high tensile steel wire mesh stabilizes the steep Lahar slope. Vegetation is already covering the steep hill. The anchored concrete beam at the top absorbs the traffic load and acts as a stiffening element.

Укрепление склонов - Selo Boyolali 2016

Rolling down the TECMAT® erosion control and the TECCO® high tensile steel wire net. Diamond shaped spike plates attach the net. Due to the optimized nail pattern, this took only a couple of days.

Укрепление склонов - Selo Boyolali 2016

The completed TECCO® slope stabilization. It took the team only four months - congratulations!

Укрепление склонов - Selo Boyolali 2016

Frontal view onto the impressive bamboo scaffold: traditional methods meeting newest technologies

Укрепление склонов - Selo Boyolali 2016

The entirely green, completely revegetated slope in 2020

 
 

Год установки

2016

Ситуация

Jembatan Samiran road lies approximately 35 kilometers west from Surakarta. The road widening project that connects Magelang and Boyolali cuts travel time and helps to spur economic growth in the area. In the past, the operation got constraint massively by the occurrence of large slope failure, in which one road lane slipped down to the creek. The site is troublesome due to its steepness and geological condition, due to the intense rainy season and frequent earthquakes.

The road engineers decided on a new effective solution, tested and withstanding the harshness of the site, actively and permanently stabilizing the problematic embankment. Quickly and safely installed in respect of the challenging accessibility. Moreover, blending in with nature: TECCO® System.

TECCO® System is a permanent and active slope stabilization system made of high tensile steel wire mesh in combination with soil nailing or rock bolting.

Rеология

Lahar

Описание

After the stakeout in collaboration with local experts and Geobrugg engineers, five hardworking drilling team completed drilling works in less than four months. Given the demanding weather conditions, this is an astonishing performance.

2'500 sqm of slope stabilization with TECCO® System mesh and hydroseeding were completed within two weeks.


Green Rehabilitator, the expert in landscape & erosion control services from Semarang, executed the hydroseeding.

Клиент

Bina Marga

Защищаемый объект

Дорога, Туристическая инфраструктура

Защита от коррозии

GEOBRUGG SUPERCOATING

Dahil olan diğer şirketler

PT. Amavi

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта