США
США

myGeobrugg

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

TECCO® SYSTEM³ fully installed - visible extra anti-erosion layer of TECMAT®. Both perfectly follow complicated slope geometry, leaving no space for further deformations

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

All TECCO® SYSTEM³ installation works required crane - visible suspended drill rig

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

Mobile drill rig supported by crane - the best solution for such a complicated project

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

Slope with already installed soil nails and anti-erosion TECMAT®

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

Overview of the protected old open pit walls - due to specific slope geometry, extra lacing was introduced

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

Extra stabilized formation from another perspective

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

Slope dell extra filled with shotcrete, to avoid further erosion and to stabilize above lying formations

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

TECCO® SYSTEM³ from another perspective - its perfect visual performance is evident

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

TECCO® SYSTEM³ from another perspective - its multi-functionality is fully visible here

Горнодобывающая промышленность / Туннели - Schwieberdingen 2016

TECCO® SYSTEM³ allows very good pre-tensioning, even on very irregular surfaces

 

Системы

 

Год установки

2016

Ситуация

The apartment house Holdergasse, in Schwieberdingen (near Stuttgart) was built in a former stone quarry in the second half of the 20th century.  At that time, the stone walls were in a good condition.  The first rockfalls occurred some years ago, caused by weather conditions. Extremely loud impacts from rocks concerned the residents.

An initial assessment by the Henke and Partner in Stuttgart, showed that a full area support was necessary.  At the customer’s request, different measurements were evaluated. The comprehensive search for suitable solutions took about two years.  The solution proposed by Henke and Partner including TECCO® SYSTEM³, proved to be the most logical and economical application.

Описание

The rock wall was divided into various areas of protection such as steep rock faces, overhanging formations, layered rocks with covered with with loose soils . Due to the tightness in some areas between the building and the rock face, a suitable solution had to be found here as well.

According to the dimensioning using RUVOLUM® software high tensile steel mesh type TECCO® 65/2 proved to be the most economical solution.

In some areas with overhangs, shotcrete filling had to be planned. The areas with loose rock were additionally covered with the anti-erosion protection mat TECMAT®. Areas where the distance to the building was less than one meter, extra lacing was implemented.
After completion, the initially skeptical residents were enthusiastic about the good adaptation to the terrain. The work was carried out by the company Bramm Bau GmbH.

Страна / Регион

Германия

Клиент

Private

Проектировщик

Henke und Partner GmbH, Ingenieurbüro für Geotechnik

Подрядчик

Bramm Bau GmbH

Защищаемый объект

Строительство, Kарьер / Шахта

Защита от коррозии

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

Kevin Coyle
 

Kevin Coyle

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / США

Электронная почта

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Инженерная защита
безопасность
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / США Regional Manager California

Электронная почта

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Инженерная защита
безопасность
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Инженерная защита
безопасность
Geobrugg North America, LLC,KS 67226 Wichita / США Regional Manager Rocky Mountains / Central USA

Электронная почта

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Инженерная защита
безопасность
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / США Regional Sales Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Инженерная защита
безопасность
Geobrugg North America, LLC,OR 97302 Salem / США Regional Sales Manager Pacific Northwest and Hawaii

Электронная почта