Швейцария
Швейцария

myGeobrugg

San Francisco Tunnel Los Bronces Access Protection

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal, Line 1 (60 m SL150)

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

Engineering study

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

General view, South Sector

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal Line (60 m SL150)

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal line 2 (114 m SL150)

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, South Portal line 1

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, South Portal line 2

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

General view, north sector

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

First works North Portal

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, North Portal

Селевые потоки и микросели - San Francisco Tunnel Los Bronces Access Protection 2018

North Portal barrier (66 m, SL150)

 

Системы

 

Длина системы

- 240 m

 

Год установки

2018

Ситуация

The San Francisco River is one of the main tributaries of the Mapocho River that crosses the city of Santiago. This river originates and passes the surroundings of the mining site Los Bronces de Anglo American, located in the middle of the Andes Mountain Range. Within its route, the river crosses a tunnel that makes a bypass through the old tailings pond of the mining site.

In summer, this sector is prone to rainfall, producing landslides that block the entrance and exit portals of the tunnel, affecting the riverbed and generating a significant environmental impact when it comes into contact with the tailings pond material.

Описание

To protect the portals, a long-term plan has been designed. It begins with mitigation works for the landslides that occurred in the vicinity of the portal. For this purpose, an engineering project was initially developed to model the water flows in the streams and then implement a solution with multiple shallow landslide barriers protecting both portals of the tunnel. The barriers will avoid future environmental impacts due to the diversion of the river waters.

Клиент

Anglo American - Los Bronces

Подрядчик

Pucará

Защищаемый объект

Kарьер / Шахта, Инфраструктура, Другое

Защита от коррозии

GEOBRUGG SUPERCOATING

Проектировщик

Geotest

Другие конструкции

Горнодобывающая промышленность / Туннели

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта