myGeobrugg
2018
A slope behind of La Marquesa Mall is almost vertical, so the consultant advised a stabilization with TECCO® G65/3 with passive anchors of 5 meters.
Lime with sand consolidated
Installaion of TECCO® SYSTEM wit G65/3 mesh, with anchor bars D28 mm, Grad 97 and a length of 5 meters
Desarrollo La Marquesa S.A.
IDM Ingeniería y Construcción S.A.
Жилой район
GEOBRUGG SUPERCOATING
Tecnilab S.A.
NDC Geotecnia