Швейцария
Швейцария

Palena

Palena - Abruzzo, Италия
2003
Клиент
Municipality of Palena
Проектировщик
Dr. Ing. Alessandro Marini
Подрядчик
CO.GE.PRI. srl - PIaneta Montagna
Защищаемый объект
Дорога, Строительство
Экспозиция
Север
Ситуация

The stretch of embankment in question was long since subject to erosion problems because of the presence of nonlinear stretches in correspondence with the material removal, in case of signifi cant fl ows. This involved problems of poor stability for the road above and for the buildings that were immediately behind.

Описание

The TECCO® choice by the design engineer was made for various reasons of which we should mention the high-tensile steel wire TECCO® mesh unit (high tensile 1770 N/mm2); the special anticorrosive treatment with aluminium-zinc alloy (GEOBRUGG SUPERCOATING); and the high bearing resistance of the mesh, by applying tension to it with the penetration of the special TECCO® cuspate shaped plates for the distribution of the anchorage loads in the bank's soil. These elements guaranteed by the TECCO® System are not present in the traditional bank protection method with gabions. Furthermore, the
particularly fast timeline for the implementation of the TECCO® System played a major part given that the work was done late in the season.

Представитель в Вашем регионе

Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Инженерная защита, Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Швейцария
Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Инженерная защита, берегоукрепление, Горнодобывающая промышленность / Туннели
Геобругг АГ
Аахштрассе 11
8590 Романсхорн / Швейцария
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Инженерная защита, Горнодобывающая промышленность / Туннели
Геобругг АГ
Industriestrasse 21
5200 Brugg / Швейцария