Камнепады, обвалы, осыпи - Kaikōura SH1 - SR10 2022

Looking north - active TECCO 65/3 mesh and Canopy

Камнепады, обвалы, осыпи - Kaikōura SH1 - SR10 2022

Multi system approach: left shallow landslide barrier SL150, centre self cleaning canopy SCC500 and right rockfall attenuator ATT60

Камнепады, обвалы, осыпи - Kaikōura SH1 - SR10 2022

Southern canopy 75 % complete, mesh and posts getting hung in the North

Камнепады, обвалы, осыпи - Kaikōura SH1 - SR10 2022

Looking down slope the canopy

 
 

Длина системы

104 m

 

Год установки

2022

Ситуация

The Kaikōura M7.8 Earthquake caused widespread damage to the road and rail corridor 20 km North and South of the Kaikoura town ship. Over 40 major slips inundated the road and rail with over 750,000 m³ of material form source zones up to 500 m above sea level.  The highly fractured Grey Wacke meant frequent future rockfalls were expected. The rockfall frequency and near vertical slope with no shoulder at SR10 created the requirement for a system that protected the road without encroaching onto it, was quick to install and requires minimal future maintenance. The slope on average is  80-90 degrees with the project being the final and most complex of the NCTIR rockfall protection systems.

Описание

A 104 m long self cleaning canopy (SCC-500) was installed at SR10. The self cleaning canopy was selected due to it's self cleaning ability and being able to withstand multiple rockfall impacts up to 500 kJ prior to requiring maintenance. The system has 13 posts ranging from 10-15 m in length with an upslope net length of between 12-26 m. The posts were anchored at 6 m high above the road with a 15 degree post inclination. The primary nets utilised high tensile (1770 MPa) ROCCO ring mesh with a secondary TECCO G65/3 for aperture control.  The structure has a support rope separation at post 6 to enable a split construction and a more efficient installation.  Type III flex heads were installed to transfer the off axis load back to the Gewi 32 anchor bar and a gap fill kit was installed to ensure  100 % system coverage. An active TECCO G65/3 system was installed in several areas below the canopy to mitigate the lower rockfall hazards. The system was installed using a combination of helicopters, cranes, Hiab's, scissor lifts and human power.

Страна / Регион

Новая Зеландия

Клиент

Подрядчик

Защищаемый объект

Дорога

Защита от коррозии

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Представитель в Вашем регионе

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Инженерная защита
безопасность
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / США Regional Manager California

Электронная почта

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Инженерная защита
безопасность
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Инженерная защита
безопасность
Geobrugg North America, LLC,KS 67226 Wichita / США Regional Manager Rocky Mountains / Central USA

Электронная почта

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Инженерная защита
безопасность
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / США Regional Sales Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Инженерная защита
безопасность
Geobrugg North America, LLC,OR 97302 Salem / США Regional Sales Manager Pacific Northwest and Hawaii

Электронная почта