Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking West - VX080-H2 debris flow barrier with 16/3/300 ROCCO ringnet tail. Note proximity to rail and road.

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking South - VX080-H2 debris flow barrier with 16/3/300 ROCCO® ringnet tail.

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking upslope - VX080-H2 debris flow barrier with 16/3/300 ROCCO ringnet tail. Note abrasion protection on the top ropes.

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking upslope - VX080-H2 debris flow barrier with 16/3/300 ROCCO® ringnet tail under construction.

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking North - SH1 and the Coastal Pacific Rail is an important lifeline and transport route going North from Christchurch.

 

Системы

VX TECCO® G65/3 Специальные решения

 

Длина системы

2 m - 10 m

 

Год установки

2019

Ситуация

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor for 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with more than 750'000 m³ of material from source zones up to 500 m above sea level. The highly fractured Grey Wacke meant frequent future rockfalls and debris loads were expected. The high rockfall and debris load frequency created the requirement for a Geohazard Solution that attenuated the energy to a manageable level and then guided the material down to a catchment area. Space was limited due to the proximity of the Coastal Pacific rail line. The SK16 site is a narrow, incised catchment that extends about 150 m above road/rail level. The slope angle is about 50-55 degrees.

Описание

A 10 meters wide VX080-H2 debris flow barrier was modified to include a 12 meters 16/3/300 ROCCO ring net tail. This system enabled the rockfall and debris energy to be attenuated and guided down to a catchment area at the toe of the slope for easier clearing and reduced maintenance.

Additional support ropes were also installed across the channel to minimise deflection onto the railway. The installation required abrasion protection on the top ropes due to the potential of it being overtopped in above design large events.

TECCO® G65/3 was used as a secondary mesh as a robust solution was required to avoid puncturing failures from the high frequency of smaller high-velocity rocks.

Страна / Регион

Новая Зеландия

Клиент

KiwiRail

Подрядчик

Rock Control

Защищаемый объект

Железнодорожная линия

Защита от коррозии

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Country Manager Southern Switzerland

Электронная почта