Швейцария
Швейцария

myGeobrugg

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SH1) 2019

Looking West - VX080-H4 debris flow barrier with 12/3/350 ROCCO® ring net tail - note proximity to rail

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SH1) 2019

Looking North - VX080-H4 debris flow barrier with 12/3/350 ROCCO® ringnet tail - note proximity to rail

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SH1) 2019

VX080-H4 - debris accumulation as per design in the catchment ditch after moderate rain

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SH1) 2019

Debris flow barrier to ROCCO® tail connection

Селевые потоки и микросели - Kaikoura Coastal Pacific Rail (SH1) 2019

Drape Support ropes to assist lower engery material to pass through

 

Системы

VX VX080-H4 Специальные решения

 

Год установки

2019

Ситуация

The 2016 Kaikoura M7.8 earthquake caused widespread damage to the road and rail corridor some 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with over 750'000 m³ of material from source zones up to 500 m above sea level. The highly fractured Grey Wacke means frequent future rockfalls and debris loads are to be expected. The high rockfall and debris load frequency created the requirement for a Geohazard Solution that attenuated the energy to a manageable level and guided the material down to a catchment area. Due to the proximity of the Coastal Pacific rail line space is limited.

Описание

A VX080-H4  debris flow barrier was combined with a 12/3/350 ROCCO ring net tail. This system enables the rockfall and debris energy to be attenuated and guided down to a catchment area at the toe of the slope for easier clearing and reduced maintenance. Additional support ropes were also installed across the channel under the ROCCO® tail where it rested on the slope to enable the lower energy material to pass under and not get caught up. Short 0.5 m tethers were installed in the lower part of the tail to stop it from kicking out towards the rail in the larger energy events. TECCO® G65/3 was used as a secondary mesh as a robust solution was required due to the high frequency of the smaller high-velocity rocks.
Shortly after completion, the system demonstrated itself to be working well.

Страна / Регион

Новая Зеландия

Клиент

KiwiRail

Подрядчик

Geovert

Защищаемый объект

Железнодорожная линия

Защита от коррозии

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Инженерная защита
Гидротехника
Геобругг АГ,Aachstrasse 11,8590 Romanshorn / Швейцария , Msc. Env. Eng.

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Швейцария Country Manager Southern Switzerland

Электронная почта