Швейцария
Швейцария

myGeobrugg

Укрепление склонов - Chenani Nashri Tunnel Portal (2017) 2017

Protected area in August 2017

Укрепление склонов - Chenani Nashri Tunnel Portal (2017) 2017

Overview of the construction site

Укрепление склонов - Chenani Nashri Tunnel Portal (2017) 2017

Drilling of rock bolts in progress using crane and drilling platform

Укрепление склонов - Chenani Nashri Tunnel Portal (2017) 2017

Laying of coir mat which shall allow further vegetation and protect against erosion

Укрепление склонов - Chenani Nashri Tunnel Portal (2017) 2017

TECCO® SYSTEM³ fully installed with coir net during hydroseeding process

Укрепление склонов - Chenani Nashri Tunnel Portal (2017) 2017

GBE-500A as extra protection against rockfalls installed directly above tunnel portal

Укрепление склонов - Chenani Nashri Tunnel Portal (2017) 2017

Another view of a GBE-500A rockfall barrier line

Укрепление склонов - Chenani Nashri Tunnel Portal (2017) 2017

Slopes fully stabilized using TECCO® SYSTEM³, vegetation shows water outbursts

 

Системы

 

Год установки

2017

Ситуация

The site was initially proposed to be treated with shotcrete but persistent seepage of water which caused slope failures and cracks on the portals led the concessionaire to go for an alternate solution which does not only stabilize the slopes but also offers a green solution and allows the hydrostatic pressure to disperse. National Highway Authority of India decided to actively stabilize the tunnel portals. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, as well as tilts and slides of individual blocks and rockfalls.

The area of the slopes to be treated and protected amounts to a total of 32'000 m² which includes 4 berms and the top path up to a maximum height of ca. 55 m.

Описание

The slope stabilization solution consisted of both active and passive protection measures.The flexible slope stabilization system consisting of TECCO® System and coir mat, system spike plates and soil nails had been selected. 

Each berm is stabilized using rock-bolts of a maximum depth of 20 m in conjunction with high tensile steel wire mesh. Perforated drain pipes, wrapped in geotextile, at an interval of 6.0 x 6.0 m are also installed to allow excess water to pass.

In addition, vertical and horizontal drainage channels are provided to channelize rain and excess water to pass and not accumulate and seep under the slopes. Variable grid patterns of 2.0 x 2.0 m and 2.5 m x 2.5 m are adopted on this project. 32 mm thick, fully threaded rock-bolts were used in this project and total drill lenght achieved is approximately 11'0000 m.

An additional GBE-500A rockfall barrier line was installed which can absorb impact energies up to 500 kJ.

See also our rockfall project Chenani Nashri Tunnel Portal (2)

Клиент

N.H.A.I. (National Highways Authority of India)

Защищаемый объект

Дорога, Инфраструктура

Защита от коррозии

GEOBRUGG SUPERCOATING

Проектировщик

IL&FS Transportation Networks Ltd.

Другие конструкции

Камнепады, обвалы, осыпи

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта