A 1,1 km long Shallow Landslide Barrier protects the road at Bulli Pass in New South Wales.

Селевые потоки и микросели - Bulli Pass (1) 2017

Placing concrete for post footings ©NSW Government

Селевые потоки и микросели - Bulli Pass (1) 2017

Overview of work site ©NSW Government

Селевые потоки и микросели - Bulli Pass (1) 2017

Site preparation ©NSW Government

Селевые потоки и микросели - Bulli Pass (1) 2017

Installation of barrier mesh fencing ©NSW Government

Селевые потоки и микросели - Bulli Pass (1) 2017

Work near satefy ramp ©NSW Government

Селевые потоки и микросели - Bulli Pass (1) 2017

Installed posts and footings ©NSW Government

Селевые потоки и микросели - Bulli Pass (1) 2017

Cranes lifting rock fall protection barrier components into position above Bulli Pass ©NSW Government

Селевые потоки и микросели - Bulli Pass (1) 2017

Precast concrete pad footings for the rockfall protection barrier posts ©NSW Government

Селевые потоки и микросели - Bulli Pass (1) 2017

Rear side of the barrier with brakes

 
 

Длина системы

1100 m

 

Год установки

2017

Ситуация

The Wollongong Escarpment Area in Wollongong New South Wales is unstable and Bulli Pass is subject to rockslides especially in times of heavy rainfall. Bulli Pass has a history of slip and rock fall events. A major slip in 2008 required slope stabilisation works with the road being closed for seven weeks. Following several events, including a serious rock fall that landed on a vehicle in 2015, there have been extensive investigations into the upslope section of Bulli Pass.  After detailed analysis Geobrugg Australia was chosen as the preferred supplier of a Rock Fall and Landslide mitigation system.

Описание

The project reduces the residual slope risk profile from landslide and rock fall events. The project consisted of a 1.1 km of SL-150 Shallow Landslide Barrier and a combination of VX and UX Shallow Landslide Barriers.  The system now provides rock fall and landslide protection from a road that has 12000 car movements a day.  The barrier is 3,5 m high including over 1000 rock nail anchors constructed in difficult terrain. The Barrier is also capable of containing a 500 kg rock travelling at 160 km/hour.

More information:

- Roads & Maritime, New South Wales

Страна / Регион

Австралия

Клиент

Roads and Maritime Authority, New South Wales

Проектировщик

Department of Public Works, (Project Management)

Подрядчик

Specialised Geo Pty Ltd (GHD Contractor)

Dahil olan diğer şirketler

Consultant Andrew Hunter Coffey/GHD (Geotechnical Consultant); Consultant Philip Flentje (University of Wollongong)

Защищаемый объект

Дорога

Защита от коррозии

GEOBRUGG ULTRACOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Monitoring
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Швейцария Country Manager Southern Switzerland

Электронная почта