Şev ve Yamaç koruma - Schänis, State Road 17 2016

Installation using a mobile drill rig

Şev ve Yamaç koruma - Schänis, State Road 17 2016

Installing a section towards south-east, before placing the spike plates

Şev ve Yamaç koruma - Schänis, State Road 17 2016

Protected object: Quiet during the day, very congested during rush-hour

Şev ve Yamaç koruma - Schänis, State Road 17 2016

Risk of toppling rocks is a thing of the past: SPIDER® ensures safe traffic (view of the north-eastern section)

Şev ve Yamaç koruma - Schänis, State Road 17 2016

Location: Linth Plain, Switzerland Federal Office of Topography, Bern, Switzerland National Map 1:50'000

 
 

Kurulum Yılı

2016

Durum

The area was formed by glaciers. With climate change, the rock underneath, molasse conglomerate rock, has become more unstable. During the past few years sections of rock, some with volumes of around 1 m³, became dangerously loose and were in danger of eminent fall onto the road, the building below and the neighboring pastures.

The Swiss State Agency for Forest and Natural Hazards immediately alerted the regional road inspectorate and political community to the potential risk.

Jeoloji

Instable blocks of molasse conglomerate.

Açıklama

As a short term emergency measure Geobrugg worked with the regional road administration and a local contractor to stabilize the most critical rock sections with SPIDER® S3-130.

As a long-term solution that ensures safe driving conditions for daily commuting, an anchored system was installed. Along the deep chasms all along the molasse bar, three levels of anchors were drilled. The higher and lower levels were drilled to a length of 4 m while the anchors of the middle rows were drilled to a length of 7 m. These anchors were drilled to a grid that measures 2.15 m x 2.15 m.

The whole project from planning to final acceptance took only six weeks.

Müşteri

State Department for Underground Construction, Canton St.Gallen, Switzerland

Yüklenici

Oberholzer Inc., Neuhaus, Switzerland

Gösterilen obje

Road, Building

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Geobrugg AG, Geohazard Solution

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta