myGeobrugg
2019
Large blocks were likely to fall from the erosional layer at the bottom of the rockface.
Top layer: fractured rock
Bottom: soil
To stabilize the blocks and to control the erosion on the lower layer TECCO® GREEN mesh with 6 m nails, a pattern of 2.3 x 2.3 m was installed.
BCIE
Gabriel Couto
Дорога
GEOBRUGG SUPERCOATING
ACI
ICA Inversiones