Amerika Birleşik Devletleri
Amerika Birleşik Devletleri

myGeobrugg

Hydraulic Power Plant Nihuil 2 - San Rafael

Kaya düşmesine karşı koruma - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

This two-cubic-meter rock block was stopped

Kaya düşmesine karşı koruma - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

The powerhouse of the Nihuil Hydraulic Power Plant

Kaya düşmesine karşı koruma - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

Maintenance work on the INT rockfall barrier

Kaya düşmesine karşı koruma - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

View of the A3S / RXI-100 barrier

 

Sistem uzunluğu

10 m - 70 m

 

Kurulum Yılı

2019

Durum

The powerhouse of the Nihuil 2 Hydraulic Power Plant suffered from rock impacts coming down from the adjacent slopes. In 2007, 10 dynamic rockfall protection barriers were installed to protect the infrastructure.

Systems installed:
1) Barrier A1S: RXI-100. Capacity: 1000 kJ. Length: 10 m. Height: 3,0 m
2) Barrier A2S: RXI-100. Capacity: 1000 kJ. Length: 10 m. Height: 3,0 m
3) Barrier A3S: RXI-100. Capacity: 1000 kJ. Length: 40 m. Height: 3,0 m
4) Barrier B: RXI-150. Capacity: 1500 kJ. Length: 54 m. Height: 3,0 m
5) Barrier C1S: RXI-025. Capacity: 250 kJ. Length: 10 m. Height: 4,0 m
6) Barrier C2S: RXI-025. Capacity: 250 kJ. Length: 10 m. Height: 4,0 m
7) Barrier INF1: RXI-030. Capacity: 300 kJ. Length: 30 m. Height: 4,0 m
8) Barrier INF2: RXI-030. Capacity: 300 kJ. Length: 70 m. Height: 4,0 m
9) Barrier INT: RXI-100. Capacity: 1000 kJ. Length: 60 m. Height: 5,5 m
10) Barrier D1: RXI-075. Capacity: 750 kJ. Length: 20 m. Height: 4,0 m

Açıklama

After a 5-ton block had hit the barrier, a general maintenance of all barriers was carried out in 2019. The works included:

- Cleaning the barriers
- Replacement of a ring net section, retaining cables, secondary meshes, and brakes
- Realignment of side post
- Fixation of cable ties

Müşteri

Gösterilen obje

Infrastructure

Korozyon koruması

Galvanized

Alt yüklenici

San Juan Vertical

Kurulan diğer uygulamalar

Kaya düşmesine karşı koruma

Yerel yetkiliniz

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Amerika Birleşik Devletleri Regional Manager Northeast

e-posta

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Amerika Birleşik Devletleri Regional Manager California

e-posta

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Amerika Birleşik Devletleri Regional Manager Central US

e-posta

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Amerika Birleşik Devletleri Regional Manager Southeast

e-posta

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

e-posta

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / Amerika Birleşik Devletleri Sales Director

e-posta