The Superintendence of Geotechnics (SGT) of the Radomiro Tomic Mine carries out drilling, construction and installation of hydrogeological wells on the surface and inside the pit.
The drillings inside the pit are planned close to the leg or on the slope of the banks. Personnel and machinery have to be protected from falling rocks.
DELTAX® G80/2 drapes with T3 junction clips, in the upper bench of drilling were chosen form SGT to fulfill CODELCO's safety standard and continue with the works.