myGeobrugg
2004
At this open pit mine, tunnel portals were put to go underground to follow coal seams. These tunnel portals are located at the bottom of a high wall.
The high wall was draped with TECCO® System mesh to protect personnel and equipment during construction and operation of the portals.
Private
Yenter Companies
Cava / Miniera
GEOBRUGG SUPERCOATING
Seegmiller International
Miniera / Gallerie