미국
미국

myGeobrugg

Saint Beat (Haute Garonne)

낙석방호시스템 - Saint Beat (Haute Garonne) 2020

The first Attenuator System in France

낙석방호시스템 - Saint Beat (Haute Garonne) 2020

The attenuator extends over a length of 60 meters.

 

Systems

 

System length

6 m

 

Year of installation

2020

Situation

The quarry, situated in the French Pyrenees, was affected by frequent rockfalls.

Description

An attenuator ATT 60 was installed to protect the endangered zone of the quarry. This attenuator is the first of its kind in France.

Post height: 4 meters
Width: 60 meters

Customer

Contractor

Gauthier SA

Protected object

Mine / Quarry

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Ginger-IMS RN St Gaudens (31)

Other installed applications

터널, 광산

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail