瑞士
瑞士

myGeobrugg

Saint Beat (Haute Garonne)

落石防护 - Saint Beat (Haute Garonne) 2020

The first Attenuator System in France

落石防护 - Saint Beat (Haute Garonne) 2020

The attenuator extends over a length of 60 meters.

 

系统

 

系统长度

6 m

 

安装年份

2020

情况

The quarry, situated in the French Pyrenees, was affected by frequent rockfalls.

描述

An attenuator ATT 60 was installed to protect the endangered zone of the quarry. This attenuator is the first of its kind in France.

Post height: 4 meters
Width: 60 meters

客户

承包商

Gauthier SA

防护对象

Mine / Quarry

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Ginger-IMS RN St Gaudens (31)

其他安装的应用程序

矿井/隧道

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址